Teaming Analytics

Analytics Mission Control

A governed operator workspace for one active analytics project - from setup and transcript readiness through analysis, reporting, and delivery review.

Active Project
—
No Active Project confirmed
Next focus
Review current stage
Workflow
Review current workflow Report state pending
Evidence
Refresh required
Project Lifecycle Overview
Active Project Summary
Operator-facing summary for the confirmed Active Project, plus review-only context when another project is loaded.
—
Review-loaded project
—
Eligible projects
Choose a Class 1-confirmed project to review locally, then use Make Active Project for the governed switch. The current Active Project is shown separately.
Project list status not available.
Operator Summary
Project overview for the confirmed Active Project, plus review-only context when another project is loaded.
Project Setup
1. Project details
Advanced Project ID override
Only use this if the generated Project ID needs a controlled correction. AMC will not overwrite a manual override until this is turned on.
* Required for candidate validation.
2. People
Facilitators
Participants
Observers
Transcript & Readiness
Upload & Link Transcript
Active Project: Not available
Upload a transcript, refresh transcripts, then select a cleaned transcript for Simulation or Retrospective review.
Add Transcript
Analysis & Reports
Follow the two-stage report lifecycle for the active Project Setup. The Simulation report path comes first; the final/combined report path becomes available after Retrospective output and required readiness evidence.
Part 1 — Simulation
Simulation workflow
Conduct analysis, build the Simulation report, then publish/track the Simulation report once.
Simulation path
Step 1 — Simulation analysis
Analysis status pending.
Waiting
Step 2 — Build Simulation report
Report status pending.
Waiting
Step 3 — Publish / Track Simulation report
Publish status pending.
Waiting
Part 2 — Retrospective
Retrospective workflow
Conduct Retrospective analysis, build the final/combined report, then update/publish the final/combined report when governed evidence exists.
Final path
Retrospective analysis
Retrospective status pending.
Waiting
Build report
Final/combined report build status pending.
Waiting
Publish report
Final/combined report publish/update status pending.
Waiting
Notifications
Prepare the message and recipient list, then save the notification setup before any internal TEST or participant email.
Current published report evidence pending.
Notification history
Governed package and delivery history pending.
Message workflow
Prepare the notification for the current published report. No email will be sent until a later controlled delivery step is authorized.
No participant email
Step 1 — Select and tailor message
Draft status pending.
Waiting
Tailor message
Draft preview pending read-model refresh.
Waiting
Step 2 — Send internal TEST
Internal TEST status pending.
Waiting
Internal TEST readiness pending read-model refresh.
Step 3 — Confirm participant recipients
Local send-list status pending.
Waiting
Recipient routing pending read-model refresh.
Step 4 — Save participant notification setup
Notification setup status pending.
Waiting
Notification setup
Saved-setup status pending read-model refresh.
Waiting
Step 5 — Send participant notification
Live notification sending remains disabled.
Not enabled
Read-only preflight
Notification Decision Preview pending read-model refresh.
Preview only
Closeout & project visibility
Read-only lifecycle model pending read-model refresh.
Read-only
Scroll to Top